W- Hotel

Date Completed: 2017

The W-Hotel Project was part of a redevelopment in Old Town Scottsdale, Arizona. The project is located one street east of Scottsdale Road, and on south side of Camelback Road. This project consists of 197 hotel rooms and 27 lavish suites, and is a spectacular high rise building 7 stories above grade and 1 level of underground parking utilizing podium type construction.  Hunt Construction was awarded this project as the general contractor. Buesing Corp was subcontracted by Hunt Construction to perform the mass excavation, shoring, and shotcrete finish walls about 11 ft deep.
  • 21,000 cubic yards of excavation & export
  • 17,200 square feet of shoring
  • 16,400 square feet of shotcrete finish walls
Read More

Banner University Medical Center Phoenix

Date Completed: 2017

Banner University Medical Center Phoenix (BUMCP), formerly known as the Good Samaritan Hospital with the iconic power architecture, launched major expansion project in late summer 2015. This project planned by Banner Health and designed by HKS Inc. will include a new 16 story patient tower that is 312 private rooms and 650,000 sf total in size. This project also includes a new emergency department, helipad, generator room, basement expansion, reconfigured parking lots, etc. The project also included three separate basements nestled within the existing structures. This $400 million dollar mega project is expected to open in December of 2019. Buesing Corp was retained by DPR to perform the technical basement excavation, shoring, underpinning, shotcrete finish walls, and parking lot grading & paving.
  • 18,500 cubic yards of excavation & export
  • 24,000 cubic yards of import and site and wall backfill
  • 12,700 square feet of shoring/underpinning
  • 11,100 square feet of shotcrete finish walls
Read More

Envy Condominiums

Date Completed: 2017

The Envy Project is being developed by a joint venture between Deco Communities and the Castelake and Isle Ranch Partners Partnership in Old Town Scottsdale, Arizona. The project is located at 75th Street, just south of Camelback Road. This project consists of 90 luxury condominium units as a high rise building 8 stories above grade and 3 levels of garage below grade, podium type construction. Buesing Corp was subcontracted by UEB to perform the mass excavation, shoring, and shotcrete finish walls about 35 ft deep.
  • 30,000 cubic yards of excavation & export
  • 23,700 square feet of shoring
  • 21,800 square feet of shotcrete finish walls
Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • UEB
Services
  • Soil Nailing
  • Import / Export Soil
  • Shotcrete Finish Walls
  • Mass Excavation
  • Backfill / Embankment Fill
Market
  • Multi-Family / Apartments / Condos

Jefferson Town Lake Apartments

Date Completed: 2017

The Jefferson Town Lake Project is being developed by JPI in Tempe, Arizona. The project is located on the north embankment of the Tempe Town Lake, and bounded on the west side by Scottsdale Road (Rural Rd.) and Playa Del Norte on the north side. This project consists of 256 apartment units constructed as a high rise building 6 stories above grade, and includes 3 levels of garage below grade as a podium structure. Buesing Corp was retained by JPI to perform the mass excavation, shoring, and shotcrete finish walls about 35 ft deep.
  • 47,000 cubic yards of excavation & export
  • 27,300 square feet of shoring
  • 24,000 square feet of shotcrete finish walls
Read More
State
  • Arizona
City
  • Tempe
Contractor
  • JPI
Services
  • Soil Nailing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shotcrete Finish Walls
  • Mass Excavation
  • Backfill / Embankment Fill
Market
  • Multi-Family / Apartments / Condos

Marina Heights

Date Completed: 2017

Buesing Corp performed the mass excavation, shoring/earth retention, and shotcrete finish walls on this mega Office project in Tempe, AZ. Marina Heights is a development for the State Farm Headquarters and was a collaboration of Ryan Companies (the general contractor) and Sunbelt Holdings, a JV for this project, and Arizona State University (ASU). The project was designed as 5 high rise glass office buildings (some retail) on top of two levels of podium garage. The tallest of the office towers, at 18 stories, will overlook the Tempe Town Lake . At $600 million for the initial development, this project is now ranked as the largest single commercial development in Arizona, edging out Cityscape in Phoenix. When complete, the office space will compromise of 1.9 million square feet. This project took three years to build, however, the schedule was very fast track for Buesing's scope, especially the first nine months, so that vertical construction could begin as early as possible.The project comprised of the following quantities:
  • 19 acres of podium garage footprint two levels deep
  • 470,000 cubic yards of excavated soil and a portion of debris
  • 105,000 square feet of shoring (4 different methods)
  • 97,000 square feet of shotcrete finish wall around the garage perimeter
  • Shotcrete Finish Wall contract was with Suntec Concrete - See that Project Detail
  • 65,000 tons of aggregate base course (ABC) material placed over-top the concrete garage deck
Read More
State
  • Arizona
City
  • Tempe
Contractor
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Project Site / Mobile Recycling
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Recycling Concrete & Asphalt
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Apache Sky Casino

Date Completed: 2017

The Apache Sky Casino (new) is being developed by San Carlos Apache Tribe near Dudleyville, Arizona. The project is located in central Arizona on tribal land south of Globe, Superior, & Winkleman, and 50 miles north of Oro Valley, on state highway SR77. This project is phased to include temporary gaming facilities and expandable to a permanent facility, expand parking, and eventually to add a hotel. This first phase included much of the necessary infrastructure to develop the site and provide access off the highway. Buesing Corp was subcontracted by Killian Construction to perform a variety of site development services, including substantial earthwork, an entrance/access road, and offsite roadway construction. Buesing Corp was awarded this project based on schematic drawings and then partnered with the project team to provide value engineering ideas all along the way and to condense the schedule. The wide variety of scopes of work Buesing performed and the associated quantities included:
  • 60 acres of site area / clearing & grubbing
  • 450,000 cubic yards of mass excavation, site cut/fill earthwork, and road embankment fills
  • 221,000 square yards of fine grading
  • 4,400 lineal feet of access road (paved)
  • 16,000 tons of ABC delivered, placed, and compacted
  • 21,650 tons of asphaltic concrete (AC) paving (onsite)
  • 5,000 tons of angular rip rap lining the storm channel
  • 1,900 lineal feet of storm drain piping
  • 11,000 lineal feet of concrete
  • 3,000 lineal feet of ADOT guard rail
  • 4 each ADOT cattle guards
  • 4,300 square yards of asphalt milling
  • 1 decel/turn lane
  • 8,350 square yards of asphaltic concrete (AC) paving (offsite)
  • 6,800 square feet of soil nail shoring
  • 6,500 square feet of permanent shotcrete wall
Read More
State
  • Arizona
City
  • Dudleyville
Contractor
  • Killian Construction
Services
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Roadwork Storm Drainage
  • Roadwork Shoring / Earth Retention
  • Mass Excavation
  • Paving Roads / Off-Site
  • Site Cut / Fill
  • Crushing & Screening of Native Soils
  • Backfill / Embankment Fill
  • Parking Lot Paving
Market
  • Sports Venues / Entertainment

Cactus Landfill Cell Construction Phase 1E

Date Completed: 2017

Read More
State
  • Arizona
City
  • Casa Grande
Contractor
  • Republic Services
Services
  • Aggregates
  • Landfill Cell Excavation
  • Clearing & Grubbing
  • Dust Control
  • Mass Excavation
  • Site Cut / Fill
  • Landfill Construction / Capping
Market
  • Landfill Construction and Closure

Copper Crossing 5MW Solar Plant (Phase I)

Date Completed: 2011

The Copper Crossing Solar Plant project is located on 144 acres of former private agricultural land in Pinal County, Arizona. The project will have an overall capacity of 17MW and will be constructed in phases, with Phase I generating 5MW. Buesing Corp.'s scope of work involved the site preparation of the construction trailer area and roadway entrances to the site and the installation of the first phase of piles for the photo-voltaic solar panels.
  • Installation of 3,096 piles
  • Piles of lengths of 12' and 14'
  • Piles set at depths of 6.5 feet and 8.5 feet
Read More
State
  • Arizona
City
  • Florence
Contractor
  • SunPower Corporation Systems
Services
  • Aggregates
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Dust Control
  • Site Cut / Fill
Markets
  • Public Works
  • Renewable Energy Earthwork

Topock Marsh Infrastructure Improvements, Phase I

Date Completed: 2011

The Topock Marsh Infrastructure Improvement project is located at the Havasu National Wildlife Refuge, within a remote area of Mohave County along the Colorado River approximately 25 miles southeast of Lake Havasu City, Arizona. Buesing Corp.'s scope of work includes the diversion and dewatering of existing water canals, as well as the construction of new fire break canals and inlet canal control structures, the rehabilitation of existing farm ditch inlets, and the installation of three water crossing bridges. The project is scheduled to reach completion in the fall of 2011.
  • 20 acres of site demo and clear & grub
  • 19,000 cubic yards of excavation
  • 500 cubic yards of furnishing and installation of riprap
  • 6,800 square feet of furnishing and installation of steel sheet pile
  • 44,250 square yards of access road grading
  • 13,700 lineal feet of concrete/shotcrete lined canals (96,000 square yards)
Read More
State
  • Arizona
City
  • Lake Havasu City
Contractor
  • C3, L.L.C.
Services
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Shotcrete Channel Lining
  • Mass Excavation
  • Road Construction
Markets
  • Water / Waste Water
  • Federal

City of Tucson 1MW Solar Plant

Date Completed: 2011

The 1.0MW photo-voltaic solar array project is tied to the Central Avra Valley Recharge facility located northwest of Tucson, Arizona, and has a potential of expansion to ultimately 5MW of capacity. Located on ten acres of former agricultural land, the project was designed by SunPower Corporation, Systems and is said to have doubled the solar power system capacity provided by the City of Tucson. Buesing Corp.'s scope of work included the overall site development and installation of over 1,000 drilled and concrete filled piles for the support of the solar panels.
  • Installation of 1,007 drilled and set piers
  • Piles of varying lengths of 15', 16', 17', and 21.5'
  • Piles set at depths of 8 feet to 17 feet
Read More
State
  • Arizona
City
  • Tucson
Contractor
  • SunPower Corporation Systems
Services
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Dust Control
  • Site Cut / Fill
  • Foundation Drilling
  • Road Construction
Market
  • Renewable Energy Earthwork

Copper Crossing 20MW Solar Plant (Phase II)

Date Completed: 2011

Fluor Enterprises, Inc. is the Engineering Procurement Contractor (EPC) on Phase II of the Copper Crossing Solar Plant in Pinal County, Arizona. Buesing Corp transitioned essentially overnight from Phase I where we were contracted directly to SunPower to Phase II contracting to Fluor on the same project and continuing work. Under contract with Fluor, Buesing Corp.'s scope of work on the project included the overall civil and site development (earthwork/grading), the construction of the concrete inverter pads and drive motor foundations, the storm water pollution plan (SWPPP), temporary pond with liner, construction of drywells, pile testing, and the installation of the balance of the driven  piles required on the project.
  • Installation of approximately 10,000 piles (in addition to those installed under SunPower contract)
  • Piles of lengths of 12' and 14'
  • Piles set at depths of 6.5 feet and 8.5 feet
  • Installation of nineteen (19) 100-foot drywells
  • 144 acres of erosion control seed mix & hydromulch
Read More
State
  • Arizona
City
  • Florence
Contractors
  • Fluor Enterprises, Inc.
  • SunPower Corporation Systems
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Dust Control
  • Site Cut / Fill
  • Road Construction
Market
  • Renewable Energy Earthwork

Unisource Energy Corp. Headquarters

Date Completed: 2011

Located on a two-acre site at Broadway Blvd. and Scott Avenue in Tucson, AZ, the new UniSource Energy 170,000 square-foot corporate headquarters is the first high rise building in Tucson in over 20 years. The nine-story building will provide office space for more than 425 employees of Tucson Electric Power, as well as include 11,000 square feet of ground-floor retail space, a conference center, meeting rooms, and about 500 parking spaces in a three-story below-grade parking garage. Buesing Corp. contracted with Ryan Companies US, Inc. to complete the excavation, shoring, and shotcrete finish walls of the underground parking garage and basement. The overall project is scheduled for completion by the end of 2011.
  • 70,000 cubic yards of excavation and export
  • 37,800 square feet of soil nail shoring
  • 35,400 square feet of 12” thick shotcrete walls
  • 28,110 square feet of finish walls
Read More
State
  • Arizona
City
  • Tucson
Contractor
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Clearing & Grubbing
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Mass Excavation
  • Shotcrete
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Bumstead Facility Brine Ponds Retaining Walls

Date Completed: 2011

Located at the Bumstead Facility in Waddell, Arizona, the project consists of the construction of a new retaining wall and the north and south retention basins. Buesing Corp.'s scope of work included the construction of the concrete and masonry block retaining wall, concrete footings, and the installation of safety rails at the top of the wall. In addition, the scope of work also included all excavation, structural fill, import and backfill, shotcrete lining, and rock mulch on the slopes.The construction for the new north and south retention basins included clearing and grubbing, minor cut and fill of the basins, new drainage channels, and grading. The project was approved by the Arizona Department of Water Safety (ADWS), Dam Safety Section, to help flatten the outside slopes of the lined brine operation ponds. SWPP and dust control permits were also required for the overall project.
  • 4,602 cubic yards of earthwork
  • 1,000 tons of rock mulch, installed at 3" thickness
  • 694 linear feet of concrete and block masonry retaining walls with attached safety railings
Read More
State
  • Arizona
City
  • Waddell
Contractor
  • Plains LPG Services, LP
Services
  • Shotcrete Slope Stabilization
  • Mass Excavation
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Industrial / Warehouse

Durango Regional Conveyance Channel

Date Completed: 2010

The Durango Regional Conveyance Channel (DRCC) is a large retention basin and channel that was completed in early 2010. The City of Phoenix will control the site and develop a multi-use recreational area for the surrounding community. Along with a large amount of export material, the project also included the installation of pipe, riprap channel, concrete structures, irrigation systems, and landscaping.
  • 700,000 cubic yards or 45,000 loads of dirt export and disposal
  • 53 acres of grading
  • 8,000 cubic yards of export per shift
Read More
State
  • Arizona
City
  • Phoenix
Contractors
  • Flood Control District of Maricopa County (FCDMC)
  • Buesing Corp. – As Prime Contractor
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Roadwork Storm Drainage
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Drainage / Flood Control / Basins / Reservoirs / Dam Embankments

Rittenhouse Detention Basin, Ph. 2 – South Basin Area

Date Completed: 2010

Buesing Corp. was contracted to build the second phase of one of the largest detention basins in the valley for the Flood Control District of Maricopa County. The site was excavated roughly 10 feet deep across the entire 80 acres associated with phase two. Final completion of the project was in mid 2010.
  • 1,200,000 cubic yards or 80,000 loads of dirt export and disposal
  • 80 acres of grading
  • 250,000,000 gallons of available water storage at completion
Read More
State
  • Arizona
City
  • Gilbert
Contractors
  • Flood Control District of Maricopa County (FCDMC)
  • Buesing Corp. – As Prime Contractor
Services
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Drainage / Flood Control / Basins / Reservoirs / Dam Embankments

Casino Arizona Resort & Spa | Indian Bend Rd.

Date Completed: 2010

The new expansion to Casino Arizona at Indian Bend Road in Scottsdale, Arizona, will include more than 100,000 square feet of indoor and outdoor conference space, a 24,000 square foot ballroom, and 21 meeting rooms. Buesing Corp. was contracted for multiple bid packages including mass import, grading, backfill, and structural excavation. The new expansion is expected to open early 2010.
  • 100,000 cubic yards of import material
  • 20+ acres of grading
  • 10,000 cubic yards of wall backfill
Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • Chanen Construction Company, Inc.
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
  • Parking Lot Paving
  • Road Construction
Market
  • Sports Venues / Entertainment

Hospice of the Valley

Date Completed: 2010

The Hospice of the Valley on 16th Street in central Phoenix, Arizona, is the group's newest not-for-profit, community-based health care services facility.  The expansion of the building included a five-story below-grade parking structure over 45 foot deep, of which Buesing Corp. was hired to excavate and shore.  This was the first project in 15 years where Buesing Corp. used a conveyer system to transport all the excavated material out of the hole directly into trucks at the surface level.  This technique provided maximum productions at the lower depths and helped keep dirt off the roads while limiting hazardous dust pollution.
  • 60,000 cubic yards of excavation and export
  • 40,000 square feet of soil nail shoring
  • 35,000 square feet of shotcrete finish wall
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Arthur Porter Construction
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Micropiles
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Structural Excavation & Backfill
Market
  • Senior Living

24th Street at Camelback

Date Completed: 2010

24th Street @ Camelback in Phoenix, Arizona, is a new eleven-story, 300,000 square foot Class A office building at the heart of a 10-acre master-planned, mixed-use complex. Buesing Corp. was hired to excavate and shore the two-level below-grade parking structure beneath the tower on the north side of the project under the office structure and the two-level deep parking garage directly south. Buesing Corp. also installed shotcrete finish walls for the north below-grade structure.
  • 55,000 cubic yards of excavation & export
  • 30,000 square feet of soil nail shoring
  • 16,000 square feet of shotcrete finish wall
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Holder Construction Company
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Banner Good Samaritan Medical Center OR Expansion & Renovation

Date Completed: 2010

Good Samaritan / Banner Health Medical Center expanded the Operating Room (OR) wing on the south side of the complex. The wing expansion all included the basement level. DPR Construction was awarded the project and subcontracted with Buesing Corp for the mass excavation, shoring, backfill, and shotcrete finish wall.
  • 4,900 cubic yards of mass excavation and soil export
  • 7,700 square feet of shoring / earth retention
  • 4,300 square feet of shotcrete finish wall
  • 1,500 cubic yards of wall backfill
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • DPR Construction
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Xcel Greater Sandhill 20MW Solar Plant

Date Completed: 2010

Currently the largest photo-voltaic plant in the state of Colorado, the 19MW Xcel Greater Sandhill Solar Project power plant is located in the San Luis Valley in Alamosa County. Located on about 200 acres, the project provides enough power for almost 5,000 Xcel Energy customers. The project began generating power on December 22, 2010, and was completed on schedule within a period of nine months. Buesing Corp.'s scope of work included the survey, staking, and installation of approximately 16,800 helical pile foundations for the ground-mounted photo-voltaic solar panels.
  • Installation of 16,800 helical screw piles
  • Installation of 280 piers per day
  • Piles set at depths of 10' and 14'
Read More
State
  • Colorado
City
  • Mosca
Contractor
  • SunPower Corporation Systems

Wal-Mart Distribution Center Solar Project

Date Completed: 2010

The Wal-Mart Distribution Center Solar Project is located on 10 acres in Casa Grande, Arizona. SolarCity will supply and install thin film photo-voltaic solar panels instead of traditional crystalline silicon solar panels, installed on a single tracking array system. SolarCity will own the panels and Wal-Mart will either lease the panels or access the solar power through a power purchase agreement (PPA). The project is expected to produce 20% to 30% of the store's needed electricity. Buesing Corp.'s scope of work included site survey for all pile locations and the furnishing and installation of foundation piles for the single axis tracking photo-voltaic solar panels.
  • Drive and install approximately 650 W8-beam piles
  • String out locations needed across site
  • Pile lengths of 13 feet to 20 feet
  • Pile embedment depths of 12 feet
Read More
State
  • Arizona
City
  • Casa Grande
Contractor
  • SolarCity

3900 E. Camelback Center

Date Completed: 2009

3900 Camelback is a three-story office development in the Camelback corridor in Phoenix, Arizona. Buesing Corp. was contracted to perform excavation, shoring, and shotcrete finish walls.  The two-story underground garage presented many obstacles including the tight property line constraints and the notoriously hard digging "caliche" material that existed throughout the excavation.
  • 110,000 cubic yards of excavation and haul off
  • 40,000 square feet of soil nail shoring
  • 36,000 square feet of shotcrete finish wall
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Phoenician Ballroom Expansion – Podium Garage, 1-level below

Date Completed: 2009

Buesing Corp. was hired by Wespac Construction Inc. to help in the addition of a new ballroom for the Phoenician Resort located at Camelback Mountain in Phoenix, Arizona.  Buesing Corp.'s scope of work included surface and select demolition of the existing building, building access roads, excavation, processing material for backfill, and soil nail/rock bolt shoring.
  • 5,000 square feet of soil nail shoring and rock bolting into Camelback Mountain
  • 20,000 cubic yards of excavated material screened and crushed into pad fill
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Wespac Construction
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Hospitality

Tempe Gateway

Date Completed: 2009

Tempe Gateway is one of the newest high-rise additions to the very popular Mill Ave District in Tempe, Arizona. Buesing Corp. was contracted for the installation of shoring and excavation. A cantilever steel beam shoring system was used to protect the recently installed light rail system and utilities adjacent to the underground garage.
  • 25,000 cubic yards of excavation and haul off
  • 13,000 square feet of cantilevered steel beam shoring
  • 200,000 pounds in wide flange beams used
Read More
State
  • Arizona
City
  • Tempe
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Foundation Drilling
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Phoenix Children’s Hospital (PCH) – Patient Care Tower & Central Plant

Date Completed: 2009

Phoenix Children's Hospital – Patient Care Tower & Central Plant is an extension to the current facility located in the heart of Phoenix, Arizona.  Buesing Corp. was contracted for both the below-grade excavation and shoring.  The project included many challenging design requirements in a tight working environment.
  • 60,000 cubic yards of excavation and haul off
  • 30,000 square feet of soil nail shoring
  • 1,500 square feet of shotcrete finish wall at the Central Plant
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Kitchell Contractors
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Clearing & Grubbing
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Mass Excavation
  • Shotcrete
Market
  • Healthcare

CityScape Downtown Phoenix

Date Completed: 2009

CityScape is a high-rise mixed-use development in downtown Phoenix, Arizona, consisting of residential, retail, office, and hotel components. Buesing Corp. was hired to perform the excavation, shoring, and shotcrete finish wall. The job was challenging given the soils in the downtown area and the depth of over 55 feet (five stories below grade) to the bottom of the hole.
  • 250,000 cubic yards of excavation and haul off
  • 24.71 miles or 130,500 linear feet of soil nails installed
  • 90,000 square feet of shotcrete facing
  • 6,000 cubic yards of shotcrete used
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Hunt Construction Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Scottsdale Fashion Square Garage

Date Completed: 2007

The Scottsdale Fashion Square Mall renovated and expanded again on the east side with a below grade garage and with multiple retail shops at grade on top of the garage. Kitchell was the awarded general contractor. Buesing Corp was subcontracted by Kitchell to perform backfill of demolition pit, mass excavation of the proposed below grade garage, haul off of excess soils, shoring / earth retention at wall line, and shotcrete finish walls.
  • 8,200 cubic yards of mass backfill of a demolished structure pit
  • Overexc and recompact of demolished and removed existing caissons and foundations
  • 118,100 cubic yards of mass excavation of underground garage two levels deep
  • 36,073 square feet of shoring / earth retention
  • 6,100 cubic yards of backfill of temporary and permanent ramps
Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • Kitchell Contractors
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Phoenix Crime Lab

Date Completed: 2005

The Phoenix Crime Laboratory Building and below grade garage was proposed by the City of Phoenix in 2005, and built by Gilbane, as the Construction Manager at Risk (CMAR), and Durrant was the architect. The project is located immediately west of the towering Sandra Day O'Conner Federal Courthouse. The project was budgeted at $34.8mil and includes 104,000 square feet of office, 58,000 sf of underground parking garage. Buesing Corp was subcontracted by Gilbane to perform the surface demolition and removals, mass excavation and export of soil, shoring and underpinning, and wall backfill.64,700 cubic yards of excavation25,500 square feet of shoring / earth retention (utilizing 5 different systems)
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Gilbane Building Company
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Public Works

Friendship Village Phase II Senior Living

Date Completed: 2004

Friendship Village Senior Living, Phase II, was an expansion to an existing retirement community complex in Tempe, Arizona that began in the 1970s. The Phase I and Phase II projects were programmed to offer independent living, skilled nursing, and memory care to the premises. The phase II (and Phase I) project was constructed by Weitz. Buesing Corp was brought on to perform the site clearing, surface removals, mass excavation, export of soil, shoring, and wall backfill.
  • 19,900 cubic yards of excavation and export
  • Overexc of the garage floor grade
  • 4,200 square feet of shoring / earth retention
  • 3,500 cubic yards of wall backfill
Read More
State
  • Arizona
City
  • Tempe
Contractor
  • The Weitz Company
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Senior Living

Maricopa County Public Health & Environmental Services

Date Completed: 2004

Maricopa County planned the construction of a new building complex for their Public Health & Environmental Services at Roosevelt Street and 16th Street in Phoenix, Arizona. Holder Construction was award the project as a general contractor. Holder subsequently subcontracted Buesing Corp to perform the surface removals, mass excavation, shoring / earth retention, and backfill. Buesing also performed the fine grading for paving and hardscape.
  • 36,000 cubic yards of mass excavation and haul off
  • 17,700 square feet of shoring / earth retention (soil nails)
  • 4,700 cubic yards of wall backfill
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Holder Construction Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Paving Roads / Off-Site
  • Site Cut / Fill
  • Backfill / Embankment Fill
  • Parking Lot Paving
  • Road Construction
Markets
  • Public Works
  • Healthcare

Friendship Village Phase I Senior Living

Date Completed: 2003

Friendship Village Senior Living, Phase I, was an expansion to an existing retirement community complex in Tempe, Arizona that began in the 1970s. The Phase I and (eventually Phase II) projects were programmed to offer independent living, skilled nursing, and memory care to the premises. The phase I (and Phase II) project was constructed by Weitz. Buesing Corp was brought on to perform the site clearing, surface removals, mass excavation, export of soil, shoring, and wall backfill.
  • 22,000 cubic yards of excavation and export
  • Overexc of the garage floor grade
  • 4,700 cubic yards of wall backfill
Read More
State
  • Arizona
City
  • Tempe
Contractor
  • The Weitz Company
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Senior Living

Scottsdale Healthcare

Date Completed: 2003

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Storquest Self-Storage

Date Completed: 2001

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Campbell Development
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Watermark Retail Shops & Storage Facility

Date Completed: 2000

Read More
State
  • Arizona
City
  • Chandler
Contractor
  • Campbell Development
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
Market
  • Commercial / Retail

Pinnacle at Kierland Phase II

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • Wespac Construction
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Pinnacle at Kierland Phase IV

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • Wespac Construction
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

The Mark (Residence on Main) – Podium Garage, 3-levels below

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • Wespac Construction
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Multi-Family / Apartments / Condos

Stetson Office Building & Parking Garage

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • W.E. O'Neil Construction Company
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Scottsdale Waterfront Retail Center, Phase I

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • The Weitz Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Main Street Plaza Retail and Condos

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • The Weitz Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Markets
  • Commercial / Retail
  • Multi-Family / Apartments / Condos

Esplanade Phase IV Condos

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Catholic Diocese Downtown Phoenix

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Site Work / Site Development
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Shoring / Earth Retention
  • Dust Control
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Northern Village, AZ Canal – North Bank

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Site Cut / Fill
  • Foundation Drilling
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

North Scottsdale Corporate Center, Phase I

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Site Cut / Fill
  • Foundation Drilling
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

North Scottsdale Corporate Center, Phase II

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Site Cut / Fill
  • Foundation Drilling
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Collier Center

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Scottsdale Waterfront Phase II Condos

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • The Opus Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Multi-Family / Apartments / Condos

SR 303L Bell Road TI

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Sundt
Services
  • Soil Nailing
  • Shoring / Earth Retention
Market
  • Highway / Transportation / DOT

Butler Lift Station

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Sundt
Services
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Shoring / Earth Retention
  • Shotcrete
Market
  • Water / Waste Water

Brophy College Preparatory School

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Clearing & Grubbing
  • Shoring / Earth Retention
  • Dust Control
  • Mass Excavation
  • Underpinning
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • K-12 Education

FBI / GSA Headquarters

Date Completed: 1999

The U.S. General Services Admin. (GSA) Region 9-Phoenix Professional Office Building was constructed as a public-private-partnership project. The new GSA facility will be located on the southeast corner of 7th Street and Deer Valley Road in Phoenix, Arizona. It will be a 225,000 square foot complex and will house both the GSA and the U.S. Department of Justice Federal Bureau of Investigation (FBI). Buesing Corp.'s scope of work included erosion control, over excavation and compaction of four building pads, onsite and offsite paving, and processing of waste slabs debris into usable materials for use in the new construction. The scheduled completion date for the overall project is the end of 2011.
  • 42,500 square yards of finish grading for pavement and landscape areas
  • 13,800 cubic yards of over excavation and compaction of 3' and 4' building pads
  • 11,100 square yards of 2", 3", and 4" paving
  • 5,031 cubic yards of export material
  • 7,500 cubic yards of processed fill on site
  • 2,200 tons of processed waste slabs debris recycled into usable material (on site crush / screen)
Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Site Work / Site Development
  • Clearing & Grubbing
  • Import / Export Soil
  • Paving Roads / Off-Site
  • Site Cut / Fill
  • Crushing & Screening of Native Soils
  • Road Construction
Market
  • Federal

Chase Field – Diamondbacks Stadium

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Perini Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Sports Venues / Entertainment

Jobbing.com (Coyotes) Arena

Date Completed: 1999

Read More
State
  • Arizona
City
  • Glendale
Contractor
  • Perini Building Company
Services
  • Aggregates
  • Material Transportation / Trucking
  • Trucking
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Sports Venues / Entertainment

Sheraton Hotel Downtown Phoenix

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Perini Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Crushing & Screening of Native Soils
  • Backfill / Embankment Fill
Market
  • Hospitality

Phoenician Resort Ballroom Expansion

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Perini Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Hospitality

Esplanade III Condos

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Markets
  • Commercial / Retail
  • Multi-Family / Apartments / Condos

Phoenix 4th Ave Jail

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Public Works

Renaissance One

Date Completed: 1999

Read More
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Kierland Commons Phase IV

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

ASU Foundation Building/Garage

Date Completed: 1999

ASU Foundation built new offices and adjoining garage (below and above grade) in the heart of ASU in Tempe, Arizona. The Foundation is a separate non-profit entity that manages the donations, endowments, and philanthropy associated with ASU. McCarthy Building was the general contractor on this infill development. Buesing Corp was a subcontractor to McCarthy for the surface removals, over-excavation, mass excavation of the below grade garage, haul off of excess soils, and shoring / earth retention.
  • Surface removals of the site
  • Overexc of office building pad
  • 18,000 cubic yards of mass excavation and haul off
  • 5,100 square feet of shoring / earth retention
Read More
State
  • Arizona
City
  • Tempe
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Paving Roads / Off-Site
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Higher Education

Hayden Ferry Lakeside Office Building, Phase I

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Edgewater Condos at Hayden Ferry

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Multi-Family / Apartments / Condos

Hayden Ferry Lakeside Office Building, Phase II

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Phoenix 911 Memorial

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Public Works

Bridgeview Condos at Hayden Ferry

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Micropiles
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Underpinning
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Multi-Family / Apartments / Condos

Mesa South CAP Water Storage

Date Completed: 1999

Read More
State
  • Arizona
City
  • Mesa
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Water / Waste Water

Glendale Downtown Parking Garage

Date Completed: 1999

Read More
State
  • Arizona
City
  • Glendale
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Public Works

Banner Thunderbird Medical Center, Service Tunnel

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Underpinning
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Banner Thunderbird Medical Center, Central Plant

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Tempe City Hall Parking Garage

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Public Works

Tucson VA Hospital Emergency Access Stairs

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tucson
Contractor
  • McCarthy Building Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Micropiles
  • Dust Control
  • Trucking
  • Mass Excavation
  • Underpinning
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Markets
  • Federal
  • Healthcare

Banner Thunderbird Hospital South Parking Garage

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Layton Construction Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Banner Thunderbird Hospital Lab & Imaging

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Layton Construction Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Underpinning
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Mesa Arts Center

Date Completed: 1999

Read More
State
  • Arizona
City
  • Mesa
Contractor
  • Layton Construction Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Sports Venues / Entertainment

Phoenix Art Museum

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Kitchell Contractors
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Underpinning
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Sports Venues / Entertainment

DC Ranch Parcel T3A – Commercial / Garage Pad

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Kitchell Contractors
Services
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Crushing & Screening of Native Soils
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

St. Joseph’s Hospital BNI Tower

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Kitchell Contractors
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

Phoenix Children’s Hospital (PCH) – Service Tunnel

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Kitchell Contractors
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Healthcare

ASU West Parking Canopies Solar Project

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Ironco Enterprises, LLC / Renewable Energy Contracting
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Foundation Drilling
  • Parking Lot Paving
Markets
  • Higher Education
  • Renewable Energy Earthwork

ASU West Ground-Mounted Solar Project

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • Ironco Enterprises, LLC / Renewable Energy Contracting
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Roadwork Storm Drainage
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Road Construction
Markets
  • Higher Education
  • Renewable Energy Earthwork

W-Hotel Scottsdale (Garage, 1-level below)

Date Completed: 1999

Read More
State
  • Arizona
City
  • Scottsdale
Contractor
  • Hunt Construction Group
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Shotcrete Finish Walls
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Hospitality

Phoenix Convention Ctr Ph III

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Hunt Construction Group
Services
  • Aggregates
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Structural Excavation & Backfill
Market
  • Public Works

Phoenix Convention Ctr Ph I

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Hunt Construction Group
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Paving Roads / Off-Site
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
  • Parking Lot Paving
  • Road Construction
Market
  • Public Works

Cox Technology Data Center

Date Completed: 1999

Cox Communications Data Center located in Deer Valley, Arizona is a $70mil expansion for future growth and services. The project is a stand-alone building 108,000 square feet in size. The project was on a fast track schedule and the site prep and earthwork as integral to meeting that schedule. Buesing's scope on this project included the following:
  • Site demo and removals
  • Clear & grub
  • Site prep, excavation, grading
  • Steel beam shoring
  • Load and haul excess soil
  • Fine grading around building, landscape areas
Read More
State
  • Arizona
City
  • Deer Valley
Contractor
  • Holder Construction Company
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Industrial / Warehouse

Gila Bend Hwy & SR-85 TI

Date Completed: 1999

Gila Bend - Buckeye Highway and the junction of State Route (SR) 85
Read More
State
  • Arizona
City
  • Gila Bend
Contractor
  • Haydon Building Corp.
Services
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Steel Beam & Lagging
  • Shoring / Earth Retention
  • Shotcrete
Market
  • Highway / Transportation / DOT

Queen Creek Marketplace

Date Completed: 1999

Read More
State
  • Arizona
City
  • Queen Creek
Contractor
  • Haydon Building Corp.
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Clearing & Grubbing
  • Shoring / Earth Retention
  • Dust Control
  • Mass Excavation
  • Underpinning
Market
  • Commercial / Retail

Maricopa County Court Tower, Phase I

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractors
  • Gilbane Building Company
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Micropiles
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Underpinning
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Public Works

ASU Interdisciplinary Science & Technology Building (ISTB)

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractor
  • Gilbane Building Company
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Steel Beam & Lagging
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Higher Education

Rittenhouse Detention Basin, Phase 2

Date Completed: 1999

Read More
State
  • Arizona
City
  • Queen Creek
Contractors
  • Flood Control District of Maricopa County (FCDMC)
  • Buesing Corp. – As Prime Contractor
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Road Construction
Market
  • Drainage / Flood Control / Basins / Reservoirs / Dam Embankments

Agua Caliente 290MW Solar Plant – Civil / Sitework

Date Completed: 1999

Read More
State
  • Arizona
City
  • Dateland
Contractor
  • First Solar
Services
  • Surface Demolition & Removals
  • Aggregates
  • Site Work / Site Development
  • Roadway Excavation, Fills, Embankments
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Roadwork Storm Drainage
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Crushing & Screening of Native Soils
  • Backfill / Embankment Fill
  • Road Construction
Market
  • Renewable Energy Earthwork

ASU Biodesign Institute, Phase II

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractors
  • DPR Construction
  • Sundt
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Higher Education

ASU Biodesign Institute, Phase I

Date Completed: 1999

Read More
State
  • Arizona
City
  • Tempe
Contractors
  • DPR Construction
  • Sundt
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Higher Education

Arizona Biomedical Collaborative TGEN

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractors
  • DPR Construction
  • Sundt
Services
  • Surface Demolition & Removals
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Backfill / Embankment Fill
Markets
  • Healthcare
  • Higher Education

ASU West Campus Classroom

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • DPR Construction
Services
  • Surface Demolition & Removals
  • Aggregates
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Higher Education

ASU West Campus Central Plant & Cooling Tower

Date Completed: 1999

Read More
State
  • Arizona
City
  • Peoria
Contractor
  • DPR Construction
Services
  • Surface Demolition & Removals
  • Aggregates
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Structural Excavation & Backfill
  • Backfill / Embankment Fill
Market
  • Higher Education

Phelps Dodge Tower

Date Completed: 1999

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Ryan Companies US, Inc.
Services
  • Surface Demolition & Removals
  • Site Work / Site Development
  • Clearing & Grubbing
  • Shoring / Earth Retention
  • Dust Control
  • Mass Excavation
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail

Pacific 16th Street Self-Storage

Date Completed: 1998

Read More
State
  • Arizona
City
  • Phoenix
Contractor
  • Campbell Development
Services
  • Surface Demolition & Removals
  • Shotcrete Slope Stabilization
  • Soil Nailing
  • Site Work / Site Development
  • Material Transportation / Trucking
  • Clearing & Grubbing
  • Import / Export Soil
  • Shoring / Earth Retention
  • Dust Control
  • Trucking
  • Mass Excavation
  • Shotcrete
  • Site Cut / Fill
  • Backfill / Embankment Fill
Market
  • Commercial / Retail