Featured Projects

Banner University Medical Center Phoenix

Date Completed: 2017

Banner University Medical Center Phoenix (BUMCP), formerly known as the Good Samaritan Hospital with the iconic power architecture, launched major expansion project in late summer 2015. This project planned by Banner Health and designed by HKS Inc. will include a new 16 story patient tower that is 312 private rooms and 650,000 sf total in size. This project also includes a new emergency department, helipad, generator room, basement expansion, reconfigured parking lots, etc. The project also included three separate basements nestled within the existing structures. This $400 million dollar mega project is expected to open in December of 2019. Buesing Corp was retained by DPR to perform the technical basement excavation, shoring, underpinning, shotcrete finish walls, and parking lot grading & paving.

  • 18,500 cubic yards of excavation & export
  • 24,000 cubic yards of import and site and wall backfill
  • 12,700 square feet of shoring/underpinning
  • 11,100 square feet of shotcrete finish walls
Read More

Marina Heights

Date Completed: 2017

Buesing Corp performed the mass excavation, shoring/earth retention, and shotcrete finish walls on this mega Office project in Tempe, AZ. Marina Heights is a development for the State Farm Headquarters and was a collaboration of Ryan Companies (the general contractor) and Sunbelt Holdings, a JV for this project, and Arizona State University (ASU). The project was designed as 5 high rise glass office buildings (some retail) on top of two levels of podium garage. The tallest of the office towers, at 18 stories, will overlook the Tempe Town Lake . At $600 million for the initial development, this project is now ranked as the largest single commercial development in Arizona, edging out Cityscape in Phoenix. When complete, the office space will compromise of 1.9 million square feet. This project took three years to build, however, the schedule was very fast track for Buesing’s scope, especially the first nine months, so that vertical construction could begin as early as possible.

The project comprised of the following quantities:

  • 19 acres of podium garage footprint two levels deep
  • 470,000 cubic yards of excavated soil and a portion of debris
  • 105,000 square feet of shoring (4 different methods)
  • 97,000 square feet of shotcrete finish wall around the garage perimeter
  • Shotcrete Finish Wall contract was with Suntec Concrete – See that Project Detail
  • 65,000 tons of aggregate base course (ABC) material placed over-top the concrete garage deck
Read More

Apache Sky Casino

Date Completed: 2017

The Apache Sky Casino (new) is being developed by San Carlos Apache Tribe near Dudleyville, Arizona. The project is located in central Arizona on tribal land south of Globe, Superior, & Winkleman, and 50 miles north of Oro Valley, on state highway SR77. This project is phased to include temporary gaming facilities and expandable to a permanent facility, expand parking, and eventually to add a hotel. This first phase included much of the necessary infrastructure to develop the site and provide access off the highway. Buesing Corp was subcontracted by Killian Construction to perform a variety of site development services, including substantial earthwork, an entrance/access road, and offsite roadway construction. Buesing Corp was awarded this project based on schematic drawings and then partnered with the project team to provide value engineering ideas all along the way and to condense the schedule. The wide variety of scopes of work Buesing performed and the associated quantities included:

  • 60 acres of site area / clearing & grubbing
  • 450,000 cubic yards of mass excavation, site cut/fill earthwork, and road embankment fills
  • 221,000 square yards of fine grading
  • 4,400 lineal feet of access road (paved)
  • 16,000 tons of ABC delivered, placed, and compacted
  • 21,650 tons of asphaltic concrete (AC) paving (onsite)
  • 5,000 tons of angular rip rap lining the storm channel
  • 1,900 lineal feet of storm drain piping
  • 11,000 lineal feet of concrete
  • 3,000 lineal feet of ADOT guard rail
  • 4 each ADOT cattle guards
  • 4,300 square yards of asphalt milling
  • 1 decel/turn lane
  • 8,350 square yards of asphaltic concrete (AC) paving (offsite)
  • 6,800 square feet of soil nail shoring
  • 6,500 square feet of permanent shotcrete wall
Read More

Where We Build

  • Arizona
  • California
  • Colorado
  • New Mexico
  • Nevada
  • Utah
  • Texas

Project Delivery Methods (PDMs)

  • Design – Competitive Bid – Build
  • Negotiated
  • Qualification – Based Bid
  • Design – Build
  • Design Assist
  • Construction Manager At Risk (CMAR)
  • Public-Private-Partnership (P3)

About Buesing Corp

Buesing Corp is a leader in the construction industry as a civil engineering contractor. We perform a majority of our work on projects as a specialty subcontractor and as a prime contractor on select civil-related projects. We have been in business since 1965 and have served multiple markets and perform a wide array contracting services. Our experience and expertise of our people helps Buesing be innovators and problem solvers. We are performance, production, safety, and quality minded in all we do. We are eager to hear from you and identify how we can help you on your next project.

Testimonials

AZ Pic of the Month

Why Choose Buesing Corp?

  • Leader in the industry in what we do.
  • Exceptional safety record.
  • Competitively priced.
  • Innovative and a problem-solving partner in precon and the field.
  • Reliable, robust, owned equipment and trucking fleet.
  • Can do attitude.
  • Respected and effective leadership throughout.
  • Experienced, dedicated, and some of the best hard-working employees.
  • Use of new technology and always striving to improve.
  • Simply the Best!