Butterfield Landfill Cell 15A

Maricopa, AZ

Project Overview

Named in honor of the Butterfield Overland StageCoach Route that crossed through Maricopa in the late 1800’s, cell 15A of the Butterfield project consisted of Earthwork/Mass Excavation, Liner Operations Cover, General Sitework, Leachate Collection and Stormwater Control. Team Buesing geared up to move almost 2 million cubic yards (3.4 Million Tons) of excavation in just over 65 working days. We provided a subgrade for the liner system, a leachate collection system, and then covered the new liner with a protective soil operations layer.

The Buesing Advantage for this project was our ability to deliver high production earthmoving along with our attention to detail and commitment to the project goals.

Location

Maricopa, AZ

Owner

Waste Management of Arizona

General Contractor

Project Duration

November 2020 - April 2021

Services

  • General Civil Contracting
  • Site Work

Deliverables

  • 1.85M CY of Mass Excavation