Project Overview
The Phoenix Convention Center lies right in the heart of downtown. On this project, we were subcontracted by DNG Construction to install a permanent tie back retaining wall and excavate for a new underground Basement addition. This required precision and the ability to work in very tight spaces with large heavy equipment. With the ROW (right of way) wedged between the Convention Center and the active Light Rail and most of the stretch of work only 50ft wide, Team Buesing was the best choice for the job.
The Buesing Advantage for this project was our vast experience with difficult downtown projects and our ability to self-perform all elements of our work.
Location
Phoenix, AZ
Owner
General Contractor
DNG Construction LLC.
Project Duration
August 2019 - October 2021
Services
- Earth Retention Shoring
- Site Work
Deliverables
- 174 Tension Anchors Installed
- 27,700 SF of Shoring Wall Excavated and Installed
- 85ea Beams (1,600,000 lbs)
- 30,000 cy of Mass Excavation
No items found.