Project Details
Project Description
ASU Foundation built new offices and adjoining garage (below and above grade) in the heart of ASU in Tempe, Arizona. The Foundation is a separate non-profit entity that manages the donations, endowments, and philanthropy associated with ASU. McCarthy Building was the general contractor on this infill development. Buesing Corp was a subcontractor to McCarthy for the surface removals, over-excavation, mass excavation of the below grade garage, haul off of excess soils, and shoring / earth retention.
- Surface removals of the site
- Overexc of office building pad
- 18,000 cubic yards of mass excavation and haul off
- 5,100 square feet of shoring / earth retention