Project Details

Contractor / Owner
DPR ConstructionDPR Construction
Services
Surface Demolition & Removals
Aggregates
Shotcrete Slope Stabilization
Soil Nailing
Land Clearing & Grubbing
Steel Beam & Lagging
Site Work / Site Development
Import / Export Soil
Material Transportation / Trucking
Shotcrete Finish Walls
Dust Control
Trucking
Mass Excavation
Shoring / Earth Retention
Shotcrete
Site Cut / Fill
Structural Excavation & Backfill
Backfill / Embankment Fill
Market
Healthcare
Location
Phoenix, Arizona
Completion Date
2010

Project Description

Good Samaritan / Banner Health Medical Center expanded the Operating Room (OR) wing on the south side of the complex. The wing expansion all included the basement level. DPR Construction was awarded the project and subcontracted with Buesing Corp for the mass excavation, shoring, backfill, and shotcrete finish wall.

  • 4,900 cubic yards of mass excavation and soil export
  • 7,700 square feet of shoring / earth retention
  • 4,300 square feet of shotcrete finish wall
  • 1,500 cubic yards of wall backfill