Project Details

Contractors / Owners
Flood Control District of Maricopa County (FCDMC)Flood Control District of Maricopa County (FCDMC)
Buesing Corp. – As Prime ContractorBuesing Corp. – As Prime Contractor
Services
Surface Demolition & Removals
Aggregates
Roadway Excavation, Fills, Embankments
Land Clearing & Grubbing
Site Work / Site Development
Import / Export Soil
Roadwork Storm Drainage
Material Transportation / Trucking Services
Dust Control
Mass Excavation
Site Cut / Fill
Backfill / Embankment Fill
Road Construction
Market
Drainage / Flood Control / Basins / Reservoirs / Dam Embankments
Location
Phoenix, Arizona
Completion Date
2010

Project Description

The Durango Regional Conveyance Channel (DRCC) is a large retention basin and channel that was completed in early 2010. The City of Phoenix will control the site and develop a multi-use recreational area for the surrounding community. Along with a large amount of export material, the project also included the installation of pipe, riprap channel, concrete structures, irrigation systems, and landscaping.

  • 700,000 cubic yards or 45,000 loads of dirt export and disposal
  • 53 acres of grading
  • 8,000 cubic yards of export per shift